Four problems our engineers solve every day

If one of these sounds familiar, let’s talk at SEMICON Europa or Precision Fair.

Timing problems only show up in commissioning.

Deterministic behaviour has to be designed in, not discovered in commissioning.

Control complexity is slowing our roadmap.

Build complex equipment faster without letting machine control complexity slow you down.

We went looking for a PLC or FPGA developer.

Often what you need is someone who owns the whole control stack, and delivers.

We don't want to depend on a supplier's black box.

White-box by default, with full IP ownership transferred to you

Frequently Asked Questions

SEMICON Europa, Precision Fair and working with Cosylab

Straight answers on machine control software, IP ownership and where to find us in Munich and Den Bosch.

10–13 November 2026. The exhibition closes at 15:00 on Friday. Messe München, Munich, co-located with electronica.

18–19 November 2026, 10:00–17:00, Brabanthallen, Den Bosch, as part of Dutch Precision Week.

We build machine control software for complex semiconductor tools and own the whole control stack: FPGA, PLC, motion, LabVIEW and systems engineering, from development to commissioning.

Teams building or modernizing complex equipment: mid-sized OEMs in metrology, inspection and advanced packaging, startups moving from lab to fab, and larger OEMs that need extra engineering capacity. Typically CTOs, Heads of R&D, VPs of Engineering and controls leads.